Thank you for your application!
We have received your resume and would like to thank you for writing to us. The responsible for Human Resources in our company will review your application and contact you if your profile meet our expectations .
Talk to you soon,Cade Engineering
FOLLOW US FOR FURTHER INFORMATION
Take a look to some of our other jobs:
Don't miss out our latest news!

When to perform a Water Hammer Analysis?
Purpose of Water hammer analysis One of the main purposes of water hammer analysis is to determine surge pressure or maximum expected pressure during transient

Atmospheric Boundary Layer: Assessing Wind Loads on Urban Structures
Accurate determination of the wind loads acting on urban structures is essential to ensure their safety and proper performance. Influence of the Atmospheric Boundary Layer (ABL)

Predictive Maintenance in Energy Plant Assets: Ensuring Efficiency
Predictive maintenance is a key strategy in industrial asset management, both in refineries and solar thermal plants. Unlike preventive maintenance, which is performed at fixed
Take a look to some of our study cases:

VIBRATION ANALYSIS ON PROCESS UNITS WITH DYNAMIC EQUIPMENT
VIBRATION ANALYSIS ON PROCESS UNITS WITH DYNAMIC EQUIPMENT PROBLEM DEFINITION Industrial building structures in which dynamic process equipment is installed (Pumps, Compressors, Stirred Reactors /

STRUCTURAL ANALYSIS OF RAILWAY ROLLING STOCK INCORPORATING SUSPENSION SYSTEM
STRUCTURAL ANALYSIS OF RAILWAY ROLLING STOCK INCORPORATING SUSPENSION SYSTEM Advantages of incorporating the suspension system to finite element analysis CADE normally uses the Finite Element

STRESS INTENSITY FACTOR (SIF) FOR SPECIAL GEOMETRIES IN PIPING STRESS ANALYISIS
STRESS INTENSITY FACTOR (SIF) FOR SPECIAL GEOMETRIES IN PIPING STRESS ANALYISIS SIF according to ASME B31J for special geometries not covered in ASME B31.1 and