Contactar

Projects

More than 20 years and more than 2,500 executed projects

Planta Piloto de Almacenamiento Térmico del CIIAE
Molten Salts Tanks and SGS Integrity Assessment
Solar Boiler (Industrial Heat)
FLEX Test Bench (Coslada Factory)
Application Of Api 653 Code To Approach Modifications On Existing Atmospheric Storage Tanks
Design and Analysis of a Flexible Pipe Connection on Creep Range
Structural Integrity Assessment During Local PWHT
3D Point Cloud (Nube de Puntos 3D) -Brownfield projects and as built engineering with 3d laser escáner - Ingeniería de proyectos brownfield e ingeniería As-built
piping system creep analysis
Caso-de-Estudio-Analisis-a-Fatiga-en-Equipos-de-Proceso - fatigue analysis
Análisis causa-raíz en tubería de alta presión - Root cause analysis in high pressure steam pipe
Flue gas ducts and stacks advisory and design